• About
  • Browse
  • email
  1. New England Railroad Photos

2018 New England Railroading

Read More
With three NS units running elephant style, train 22K backs down under the Main St bridge and onto the east wye in Ayer MA.<br />
8/20/2018
218 / 314

With three NS units running elephant style, train 22K backs down under the Main St bridge and onto the east wye in Ayer MA.
8/20/2018

  • Grain from here to there...<br />
The first half of an empty grain train sits quietly in the Fitchburg yard.<br />
8/20/2018
  • With three NS units running elephant style, train 22K backs down under the Main St bridge and onto the east wye in Ayer MA.<br />
8/20/2018
  • Train 28N waits to back into the auto facility at the Willows as the second half of the grain train works the loop track at the milling.<br />
8/20/2018
  • Meanwhile, the Pan Am OCS train hides out in the puckerbrush near the old Ford plant at the Willows.<br />
8/20/2018
  • The second half of the grain train comes off the loop track at the milling.<br />
8/20/2018
  • Train ED-9 notches up under the new signal bridge and past the "T" station in Shirley MA.<br />
8/20/2018
  • Train ED-9 notches up under the new signal bridge and past the "T" station in Shirley MA.<br />
8/20/2018
  • The OCS train eventually backed down into the center of Ayer before running east back up into Maine.<br />
8/20/2018
  • No Comments
  • Photo Sharing
  • About SmugMug
  • Browse Photos
  • Prints & Gifts
  • Terms
  • Privacy
  • Contact
  • Owner Log In
© 2023 SmugMug, Inc.