• About
  • Browse
  • email
  1. New England Railroad Photos

2017 New England Railroading

Read More
The power on 22K featured a BNSF unit sandwiched between two NS units all running elephant style. 6/22/2017 - 598C2496dK
134 / 254

The power on 22K featured a BNSF unit sandwiched between two NS units all running elephant style. 6/22/2017 - 598C2496dK

  • Sporting four GP40s instead of the usual pair, train B740 backs off the controlled siding at MP83 onto the yard lead with a cut of cars for the Mass Central. 6/20/2017 - 598C2442dK
  • After dropping cars for the MCER, B740 eases back out onto the controlled siding in the CSX yard. 6/20/2017 - 598C2450dK
  • The weather yesterday was clear and warm - perfect for some training. Started in Worcester with train POSE tied down and waiting for a recrew at New Bond St. 6/22/2017 - 598C2465dK
  • In Ayer, train EDPO was also waiting for a recrew at AY Tower. 6/22/2017 - 598C2472dK
  • Let's all meet at the tower!<br />
In the center of Ayer, things got a little crazy for a while as 22K started to back down the East Wye, an outbound "T" train came through and EDPO was still waiting for a crew. <br />
6/22/2017 - 598C2482dK
  • The power on 22K featured a BNSF unit sandwiched between two NS units all running elephant style. 6/22/2017 - 598C2496dK
  • Switcher FI-1 pulling hard out of the Fitchburg yard. 6/22/2017 - 598C2512dK
  • P&W train WOGR switches the  Gardner yard. 6/22/2017 - 598C2520dK
  • No Comments
  • Photo Sharing
  • About SmugMug
  • Browse Photos
  • Prints & Gifts
  • Terms
  • Privacy
  • Contact
  • Owner Log In
© 2023 SmugMug, Inc.